History Part 2.2 – Fred P Tosch and The Master Model Home Continued

Following on the success of the first year, the Homeowner’s Service Institute and the Democrat and Chronicle selected Fred Tosch to build the 1928 Master Model Home. The 1928 home was built just half a block down from the 1927 home, and was to be accompanied by the simultaneous construction of nine other additional homes on Wimbledon Road. This spectacle of home building activity from the breaking ground of the Master Model Home on June 7, 1928 to the conclusion of the four-week exhibition of the completed and decorative house on October 7, 1928 reportedly drew over 20,000 visitors. Continue reading

Advertisement

Kitchen Progress Episode 1

One of the key selling points of our house…for me atleast…was that it still had its original kitchen. During the ensuing years since our purchase, I have only come across 4-5 other houses (1-2 a year) that still have their original culinary cabinetry intact through my obsessive observation of the Rochester real estate market. It had a leaking utilitarian faucet, was slathered in green paint, its hardware had been replaced in the 1950s, and there were only about three feet of useable counter…but it was original!!! Continue reading

Garage Rehab Phases 1, 2, and 2.5

Outbuildings are a sorry lot. They generally are “creatively” constructed, receive the least maintenance attention, and often undergo heavy use. There are countless garages throughout Rochester that were built on a shoe-string budget 100 years ago that gently lean or twist in the direction of the prevailing winds or sink toward an improperly routed downspout. Many have not seen a coat of paint in decades, some have half-rotten vehicle doors, while others have boarded up windows. Back when we were house shopping, nearly every house in our budget had a garage that was afflicted by one if not many of these conditions. Continue reading

Rehabbing the Radiators

It’s been bitterly cold this week with lots of snow after near spring like conditions began to force some early bulbs to flower last week…thanks upstate New York. What better time to talk about the incremental saga of tuning, upgrading, and rehabbing our steam heating system.

Our house was originally outfitted with a cutting edge American Radiator Company steam heating system comprising of an Ideal Redflash Boiler and Corto radiators. I have a strong affection for Corto radiators, Continue reading

Surprise! Bathroom Rehab

We kept busy over the warm months this year, primarily focusing on the garage…which still has a way to go…maybe next year! One not so busy weekend, Kit suggested that we tackle finishing the bathroom as it was literally in pieces. We had rebuilt the shower valves, re-grouted the tile, and added a bathroom fan last year, but the wall fabric that had originally been installed in 1928 to prevent moisture seeping into the walls was literally peeling off the walls. The original pedestal sink had a odd 1980s Delta mixer faucet and hand sprayer. The medicine cabinet had relieved itself of the mirror shattering pieces all over the floor as mentioned in the last post and the original bare-bulb light fixture had shorted out and could not be disassembled to allow replacement of its internal socket. Continue reading